Ongoing projects
European funding within the framework of the Connecting Europe Facility (CEF)
Connecting Europe Facility 2022
Within the framework of the Connecting Europe Facility (CEF) 2022 call, the European Commission signed the Grant Agreement for the project “bridging missing links between france & spain: studies for rehabilitating the cross-border railway section pau–zaragoza”.
Main objective:
- advanced studies to further pave the way for work on the Bedous-Canfranc-Zaragoza section;
- necessary studies for the reopening of the railway line;
- studies for the declaration of Public Utility in France;
- studies concerning the Somport Tunnel;
- studies concerning access to the PLAZA logistics platform and the remodeling of Zaragoza’s railway network.
Project Data
- Start / end date: 02/01/2023 – 04/30/2026.
- Total cost: €17,901,998.00.
- MCE financing: €8,900,999.00.
Partners
- Region Nouvelle-Aquitaine, Coordinator.
- Ministry of Transport, Mobility and Urban Agenda (MITMA), currently MTMS.
- Government of Aragon.
- Administrador de Infraestructuras Ferroviarias (ADIF).
- Ministere de la Transition Écologique et de la Cohesion des Territoires (MTECT)
Affiliated Entities
- Transpirenaica Foundation affiliated to the Government of Aragon.
Project Actions
- WP1: Project management
- WP2: Project communication and dissemination
- WP3: Studies required for the declaration of public utility in France
- WP4: Functional studies to remodel the local rail network in Zaragoza in order to prepare for the new rail traffic generated by the Global Project.
- WP5: Drafting of the detailed design of the signaling and communication facilities (CMS of the Somport railway tunnel).
- WP6: Drafting of the construction project for the access to the PLAZA logistics platform.
News
- 24-03-2022: New impulse to the reopening of Canfranc as a trans-Pyrenean axis for the transport of goods and logistics.
- 22-06-2023: Europe allocates 9.1 million euros for the reopening of the Canfranc international line.
- 22-06-2023: Pau – Canfranc – Saragosse : 9.1 million euros from Europe !
- 23-04-2024: Transport awards for 732,000 euros the functional study to remodel the railway network of zaragoza in view of the future increase in traffic.
- 11-05-2024: Transport tenders for 511,700 euros the study to analyze the direct rail connection between the Pau-Canfranc section and the Mediterranean Corridor.
- 11-06-2024: Transport formalizes for 731,808 euros the drafting of the study to remodel the railway network around Zaragoza.
- 5-09-2024: Transport awards the study of a railway itinerary between the Pau Canfranc section and the Mediterranean Corridor.
- 28-07-2025: Adif awards for 2.8M€ the drafting of the standard gauge connection project for the Zaragoza Plaza logistics platform.
- 11-07-2025: Adif awards the drafting of the project to upgrade the Somport tunnel for the reopening of international traffic.
- 18-11-2025: Launching of the consultation on the compatibility of urban planning documents (MECDU): Project for the reconstruction of the Pau-Canfranc railway line.
- 04-12-2025: The European Commission supports the reopening of the Pau-Canfranc train to “relieve road traffic in fragile areas”.
- 04_12_2025: Transcanfranc triples the number of freight train trips in 6 months of operation.
- 15-12-2025: The Region promises “180 trucks less on the road” thanks to the reopening of the train line between Pau and Canfranc
Newsletters
- Newsletter: 2nd Semester 2025